timo bollerhey
Insights

How the H2Global mechanism works: Q&A with Hintco CEO Timo Bollerhey

1. You and Markus Exenberger started H2Global together in 2020. Your roles are often described as architect and builder. At the time, most people were reaching for production subsidies. What convinced you both that a trading intermediary was the way to kick-start clean commodity markets?

We saw the need for a new, market-based approach using public funding to catalyse market creation that would complement the existing support landscape. CAPEX subsidies play an important role, but carry an inherent risk of non-performance. When projects fail to deliver, public funds are lost without impact.

The missing piece, as we saw it, was an OPEX-oriented mechanism that not only creates real business cases for producers and offtakers, but also contributes directly to market creation. Equally important was designing a scheme that uses public funding with maximum efficiency, with the explicit aim of becoming redundant once markets are self-sustaining.

Ultimately, the goal is to support the transformation of the clean hydrogen sector into an asset class that attracts private capital at scale.

2. Producers say they cannot build without buyers. Buyers say they cannot commit without supply. Why has that deadlock proved so hard to break in clean hydrogen, when it didn’t hold back solar or wind?

Actually, solar and wind are a very good example, because they faced a similar conundrum some 25 years ago. There too, it was an OPEX-oriented mechanism, namely feed-in tariffs such as the EEG in Germany, that played a pivotal role in breaking the deadlock.

But while feed-in tariffs were highly effective, they also carried a risk of enabling excess returns for producers and proved extremely costly for the public purse. The task now is to develop mechanisms that achieve a similar effect with far less costly side effects. We believe the H2Global mechanism is one step in that direction.

3. If you had to explain a double-sided auction to someone with no financial background, how would you do it, and what would you compare it to?

The core idea is to place a trading intermediary between the supply and demand sides. That intermediary is a genuine trader, and it must be completely independent and impartial so it can receive public support for its trading activities without distorting the market. Crucially, it is designed to go out of business once it is no longer needed.

This intermediary – which we called Hintco – trades clean hydrogen and its derivatives through a double-sided auction: one auction on the supply side, and one on the demand side. It therefore buys and sells in a highly competitive way. In practice, however, there will usually be a gap between the price it pays for the product and the price it achieves in its sales auction, at least in the short to medium term. That is where public support comes in: governments bridge this price gap and compensate the intermediary.

Because Hintco enters into long-term offtake agreements with winning producers – essentially guaranteeing to buy their future production – those producers secure predictable cash flow from a highly reliable buyer. That gives them the certainty they need to invest in a production facility.

In effect, the double-sided auction can be compared to a contract-for-difference (CfD), except that a CfD works well in established, transparent markets – and at this nascent stage of the clean hydrogen economy, that transparency does not yet exist. The market has to be developed first before such mechanisms can take over. In principle, the H2Global mechanism emulates a CfD: it delivers similar effects while generating the transparency itself, by continuously revealing price data and liquidity.

4. Hintco buys on long-term contracts and sells on short-term contracts. Why the difference, and who carries the risk in between?

As mentioned, producers need cash-flow certainty in order to invest, which is why long-term contracts are required on the supply side. On the demand side, the situation is different. Most offtakers are used to purchasing energy on spot markets and cannot absorb long-term price risk – they need to move with the market. We also expect the market's willingness to pay will rise as regulations such as CO₂ pricing or quotas take effect.

This transformation of tenor has three effects:

First, it gives offtakers flexible access to the commodity. 

Second, it dynamically adjusts public support to the minimum necessary, making the H2Global mechanism highly efficient. 

Third, it creates liquidity and continuous price transparency – a vital precondition for market formation.

The risk in between is carried by the intermediary, Hintco, and ultimately underwritten by public funding bodies, which bridge the gap between the long-term purchase price and the short-term, dynamically developing sales price.

5. Tell us about the innovative set-up of H2Global, which comprises H2Global Foundation and Hintco. What is the background to this governance structure?

Hintco is not a state-owned company, as was initially envisaged, so we had to find another way to guarantee its neutrality and impartiality at all times, while simultaneously remaining close to governments and close to the market. The solution was to establish H2Global Foundation – a non-profit foundation funded by donations from industry and philanthropy – which in turn owns the intermediary, Hintco.

The decisive element is the operational separation between the two. H2Global Foundation is the owner, but Hintco operates free of instruction, ensuring impartiality is secured at a structural level. The division of labour follows directly from that: H2Global Foundation leads international outreach, conducts research, and promotes the H2Global mechanism globally, while Hintco designs and implements the instrument and auctions, carries out the trading, and acts as the contractual counterparty on both sides of the double-sided auction .

6. Bidders cannot take a final investment decision before they bid, but their bids must be unconditional. What percentage of projects and companies are in that position? 

That is correct – under EU state aid rules, the final investment decision must not already have been taken at the time the contract is awarded. So the real question is what a project needs in order to place a firm, unconditional bid in Hintco's auctions. Ideally, it has already completed its front-end engineering design (FEED) or is at least close to that stage.

What we see is a pipeline at very different levels of maturity: a solid group of projects is already advanced enough to bid competitively, while a much larger number is still working towards that point. That is entirely normal for an emerging sector – and it tells us exactly where the leverage lies.

This is why the H2Global framework was conceived holistically from the outset, not as an intermediary mechanism alone. Alongside the double-sided auction, it also envisaged access to finance through a venture capital-style project development fund for early-stage development, so that projects can build the financial capacity to complete FEED and enter the bidding pool. To date, however, the priority has been on implementing the trading intermediary pillar; the other pillars of the framework have not yet been rolled out. 

In our view, that funding gap should be closed – but it has to happen outside of, and independently from, H2Global to maintain strict auction impartiality and avoid any conflict of interest. Strengthening that funnel is one of the most effective ways to accelerate the entire clean hydrogen economy. 

7. Where does the public money to cover the price gap actually come from? Is it a line in a budget, a pot of cash, a guarantee, or something else? And does H2Global ever hold that money itself?

That always depends on the government providing the funding. The H2Global mechanism is deliberately flexible on this point and can accommodate different budgetary requirements and approaches.

The money is typically provided through a formal grant agreement with the public funding body. In principle, funds could also be received upfront or under a guarantee, which would allow additional features to be built into the auction design on that basis. What matters most, however, is that the public funds are irrevocably committed – because that legal certainty is what underwrites the long-term offtake agreements Hintco signs with producers, making projects bankable. 

8. Who actually receives the public money? Most people assume it ends up with the clean hydrogen producer.

Hintco is the only entity that receives public funding directly under the H2Global mechanism. The money never flows to a producer as a subsidy; it flows to the intermediary to bridge the gap between the long-term purchase price and the short-term sales price.

Producers and offtakers do benefit – but indirectly. Producers achieve a sales price that would not be available in a situation of market failure, where supply and demand simply do not meet, and offtakers gain access to volumes at a price the market can currently bear. In both cases, the benefit is determined on a highly competitive basis through the double-sided auction, rather than negotiated or allocated administratively.

That distinction matters for two reasons. First, it keeps the public funding price-based rather than asset-based: public money is only disbursed against a product that is actually delivered, not against a plant that may or may not perform. Second, because both sides of the trade are set competitively, the size of the gap – and therefore the amount of public money required – is revealed by the market itself rather than estimated by a public authority.

9. The report states that H2Global auctions are not auctions in the conventional sense, but competitive award procedures with a negotiation phase. What do people picture when they hear the word “auction”, and how far is that from what actually happens?

When people hear "auction," they usually picture something like an art auction at Sotheby's or a car auction: bidders in a room, prices called out, a hammer falling, and the winning bid decided within minutes. It sounds mechanical and instantaneous – one number decides everything.

What we run is considerably more involved. Hintco is not buying a painting that already exists and can be inspected. It is entering into a ten-year purchase agreement for a physical commodity that, in many cases, is not yet being produced anywhere at scale. You cannot reduce that to a single number without first agreeing on what exactly is being bought: the product specification, the certification and sustainability requirements, delivery points and logistics, volume profiles and ramp-up, security and collateral arrangements, force majeure, and termination rights. All of that has to be settled before a price becomes meaningful at all.

The process therefore runs in stages. First, there is a pre-qualification phase in which we assess whether a bidder is technically and financially capable of delivering. There is then a dialogue phase in which the contractual framework is clarified and, where necessary, discussed with the qualified bidders – not to dilute terms, but to ensure they are workable and bankable for a first-of-a-kind project. This takes place simultaneously with all bidders in a structured, transparent, and non-discriminatory format, resulting in a unified contractual design. Only then comes the binding competitive phase: firm, unconditional, comparable bids, evaluated against transparent criteria, with volume and price as the decisive award metrics. 

A close analogy would be a major public infrastructure tender, or the way long-term LNG supply contracts are awarded: the competition is genuine and price-driven, but it sits on top of an intensive process of defining the underlying product and the contract.

The competition is therefore entirely real – bidders compete on price, and they compete hard. What differs from the popular image is the work required to reach the point where bids can be compared like-for-like. In a market this nascent, standardisation cannot be assumed; it has to be created. That is a fundamental part of what the competitive procedure achieves, and it is why the H2Global mechanism produces genuine price discovery and market transparency.

10. H2Global is designed to make itself redundant. What does that day look like, and how will you know it has arrived?

The clearest signal is the price gap closing. Hintco exists because the cost of producing clean hydrogen and its derivatives sits well above what the market is currently willing to pay. Once supply and demand curves converge – through falling production costs, rising carbon prices, binding regulatory quotas, and offtakers who can pass costs through – there is no longer a funding gap to bridge, and no need for an intermediary to sit between the two sides.

The second signal is the emergence of a liquid, transparent market. Today, there are no reliable reference prices for clean hydrogen, which is precisely why a physical intermediary is needed to create price discovery via double-sided auctions. Every auction Hintco runs contributes to that goal. Once credible reference price indices are established – partly on the basis of the transactions and data H2Global has generated – the market can be served by simpler, purely financial instruments. Contracts-for-difference, hedging products, and standard commercial offtake structures can settle directly against those indices. 

At that point, Hintco’s interventionist trading role naturally falls away because the market can stand on its own feet.